DESCRIPTION
Interior renovation of the San Juan Bautista Church, which had wall defects caused by damp, plasterwork in poor condition and obsolete facilities. Work on plasterwork, flooring and paint.
KEY ACTIONS
Damp treatment in the walls using a chemical barrier, consisting of impregnating the inside of the walls with water and salt-resistant formulations, while maintaining water vapour permeability. Structural reinforcement of the timber framing of the tower, vestry and choir.